NASA disclosed today that an investigation earlier this week that found multiple dings in the space shuttle Atlantis' heat shield must be restarted because about 40 tiles were missed.
The crew of the Atlantis had spent nine hours inspecting the heat shields on Tuesday. Using the shuttle's robotic arm, astronauts collected data and images of critical areas of the shuttle's thermal protection system, especially on the craft's nose and the edges of its wings. Part of a routine checkup after any shuttle launch, the inspection took up most of the crew's first full day in space.
A few hours after the inspection began, NASA announced that dings or scratches were found in some of the shuttle's outer tiles.
Scratches were found on the forward part of the shuttle's right wing, close to where it connects to the fuselage, according to NASA spokeswoman Katherine Trinidad. The damage, found on four different heat shield tiles, looks minor, but NASA will continue to investigate it.
The damage seems to be related to a debris impact that occurred about 104 seconds after the Atlantis lifted off Monday afternoon.
After today's spacewalk wrapped up late this afternoon, NASA announced that they have discovered that an area of the shuttle's heat shield had not been inspected at all. The area is below the forward thrusters on the vehicle's port nose.
The NASA astronauts will again use the robotic arm and sensors attached to it to run another inspection before the scheduled spacewalk begins Friday morning.
NASA has been especially diligent about studying the heat shields since the space shuttle Columbia broke apart upon re-entry on Feb. 1, 2003. According to NASA, an investigation found that the disaster was caused by a hole in the heat-resistant panels that protected the wing from the high temperatures of re-entry. The hole allowed superheated air into the wing, which was destroyed, sending the shuttle spinning out of control before it broke apart.
Atlantis blasted off from the Kennedy Space Center on Monday afternoon. The crew is on an 11-day mission to repair and upgrade the Hubble Space Telescope.
References
- NASA shuttle crew uses robotic arm to inspect for damage
- NASA investigating damage to heat shield of shuttle Atlantis
- NASA shuttle blasts off on Hubble life-saving mission
- NASA astronauts install new computer on Hubble telescope
- NASA: Robots 'essential' to installing space station backbone
- space shuttle Columbia broke
Latest on Industrial
- Slideshow: Verb IT first with HP Performance Optimised Datacentre (POD)
- Government denies scrapping solar town
- Victorians to test electric cars
- Nissan car brakes automatically to avoid collisions
- Scientist: Technology can solve problems, introduce new ones
- Astronauts sky high on out-of-this-world twittering
- Sydney Water begins SCADA upgrade
- NASA telescope spies 'truly empty' hole in space
- The car-puccino: A car that runs on coffee
- IBM explores cheaper solar cells
Hardware Essentials
- Slideshow -- Tech of Yesteryear: Where Old Computers Find Their Final Resting Place
- Chip shipments could face slow growth
- Gartner to slash 2009 chip forecast by $25 billion
- Researchers find state of matter that may extend Moore's Law
- Forgotten history: the true origins of the PC
- Researchers develop bug-blocking chip monitor
- Intel, AMD multicore chip sales may be slowed by software
- Asustek turns to Celerons amid Atom shortage
- Strong Intel sales push global PC chip market to record Q2
- Via pushing into laptop, desktop markets with 5 new chips
- SOE Architect - Permanent - North Ryde - $9/09/2010
Other
I.T. & T
SOE Architect - Permanent - North Ryde - $ - Business Analyst- Super/insurance experience- Mailroom integration!9/09/2010
Other
I.T. & T
Business Analyst- Super/insurance experience- Mailroom integration! - SOE Apple systems engineer - Attractive Package - North Ryde Location9/09/2010
Other
I.T. & T
SOE Apple systems engineer - Attractive Package - North Ryde Location - Senior Analyst/Programmer (Natural Adabas)9/09/2010
Other
I.T. & T
Senior Analyst/Programmer (Natural Adabas) - JDE Technical Systems Analyst/Consultant - Fixed term contract or Perm9/09/2010
Other
I.T. & T
JDE Technical Systems Analyst/Consultant - Fixed term contract or Perm - Client Coordinator - SAP R3 Production Experience Required - Leading I9/09/2010
Other
I.T. & T
Client Coordinator - SAP R3 Production Experience Required - Leading I - Service Desk Analyst9/09/2010
Other
I.T. & T
Service Desk Analyst
TechWorld Blogs
Recent blog posts
- Data trumps speed in broadband battleground
- Windows Phone 7: how big can it get?
- NBN gets a turn at political football
- Internet filter gets caught up in politics
- TechWorld Forums goes live
- Selective sourcing the hybrid of cloud services
- Social networks catch more business attention
- RIP Kin
- Telstra’s copper and NBN’s fibre: will the two ends meet?
- RIP Windows 2000, XP lives on
Recent comments
- How do you remove it
11 hours 37 min ago - Can't compose, forward or reply to emails with new yahoo mail fo
20 hours 49 min ago - Awesome
1 day 31 min ago - This is great news, AMD just
1 day 3 hours ago - Same kind of call...
2 days 11 hours ago - windows scam
2 days 11 hours ago - Ease..
2 days 19 hours ago - Bandwidth vs Speed . . . . . . They are the same thing
2 days 20 hours ago - I have plenty of referrals left
2 days 22 hours ago - Plagiarism
3 days 18 hours ago - Event veiw scam
4 days 38 min ago - how wide a range does this system tracks.
4 days 8 hours ago - Quality of journalism
4 days 11 hours ago - Nice post on SEO. SEO helps
4 days 15 hours ago - They got the business from me!
5 days 8 hours ago - can' wait to see!!!
5 days 11 hours ago - ubuntu 10.10 beta
5 days 13 hours ago - Download Academy
5 days 13 hours ago - Scam from India
5 days 17 hours ago - they TRIED to get me
5 days 20 hours ago










Comments
Post new comment